天堂入口网站,爱很简单电影完整版在线观看,破茧电视剧全集在线观看,保镖电影完整版在线观看,一区激情,亚洲综合播放,教父1普通话在线观看完整版高清

First major tunnel over 5,000 meters drilled through along China-Laos railway

Source: Xinhua| 2019-03-21 12:51:40|Editor: xuxin
Video PlayerClose

LAOS-BOTEN-CHINA-RAILWAY-TUNNEL

Constructors and local Lao residents attend the drilling-through ceremony of Boten Tunnel along the China-Laos railway in Boten of Laos, March 21, 2019. A Chinese railway engineering company on Thursday drilled through Boten Tunnel, the first major tunnel over 5,000 meters along the China-Laos railway. This marks an important milestone in the construction of the project. The Boten Tunnel, with a length of 6453.5 meters, is among the 10 major tunnels longer than five km along the China-Laos Railway. The tunnel has to pass through unfavorable geology such as karst, bedding rock, fault fracture zone, gypsum, carbon mudstone, and water inrush, and it varies, thus creating lots of difficulties to the Chinese engineering company, China Railway No. 5 Engineering Group (CREC-5). (Xinhua/Wang Jingqiang)

   Prev 1 2 3  

KEY WORDS:
EXPLORE XINHUANET
010020070750000000000000011100001379124501